2019-07-01_Simply_Knitting

(Nora) #1

42 Subscribe at http://www.theyarnloop.com/simply-knitting


SUMMER MOBILE


YOUWILLNEED
QScheepjesCatona(4ply,100%
cotton,25g/62m)1 ballofeach:
YarnAPrimrose(522)
YarnBEnglishTea(404)
YarnCSnowWhite(106)
YarnDJetBlack(110)
YarnECornflower(511)
YarnFFresia(519)
YarnGPoppyRose(390)
YarnHTangerine(281)
YarnJKiwi (205)

SUMMERMOBILE
SUNRAYS(MAKE1)
Caston 10 sts using 3.25mm needles and Yarn A with cable cast
on.
*Row 1 Knittolast2 sts,k2tog.[9sts]
Rows2 to 8 RepRow1,7 moretimes.[2sts]
Caston8 stsusingcablecaston.[10sts] *
Repfrom* to* 8 moretimes. [10 sts]
RepRows1 to 8. [2 sts]
Castoff.

SUNCENTRE(MAKE2)
Caston 61 stsusing3.25mmneedlesandYarnL.
Rows1 to 5 Startingona WSpurlRow,work in st st.
Row 6 (K2tog) 30 times,K1.[31sts]
Rows7 to 9 Startingona WSpurlRow,work in st st.
Row 10 (K2tog) 15 times, K1. [16 sts]
Row 11 Purl.
Row 12 (K2tog)8 times.[8sts]
Breakyarnandthreadthrough rem sts. Pull tight to fasten.

CLOUD(MAKE1)
Caston 20 sts using 3.25mm needles and Yarn C.
Row 1 Knit.
Row 2 K1, kfb, knit to the last 2 sts, kfb, K1. [2 sts inc’d]

Rows3 to 6 RepRows 1 to 2 twice more. [26 sts]
Rows7 to 9 Knit.
Row 10 Caston5 stsatbegofrow,K31.
Row 11 Caston5 stsatbegofrow,K36.
Row 12 K1,kfb,knit to the last 2 sts, kfb, K1. [2 sts inc’d]
Row 13 Knit.
Row 14 to 17 RepRows 12 to 13 twice more. [42 sts]
Rows 18 to 21 Knit.
Row 22 K1,k2tog, knit to the last 3 sts, k2tog, K1. [2 sts dec’d]
Row 23 Knit.
Rows 24 to 25 RepRows 22 to23.[38sts]
Row 26 Castoffthefirst4 sts,knit the rem sts. [4 sts dec’d]
Row 27 RepRow26.[30sts]
Row 28 K1,kfb,knit to the last 2 sts, kfb, K1. [2 sts inc’d]
Row 29 Knit.
Rows 30 to 31 RepRows 28 to 29. [34 sts]
Rows 32 to 33 Knit.
Row 34 K1,k2tog, knit to the last 3 sts, k2tog, K1. [2 sts dec’d]
Row 35 Knit.
Rows 36 to 37 Rep Rows 34 to 35. [30 sts]
Row 38 Knit.
Row 39 Castoffthefirst4 sts,knit the rem sts. [4 sts dec’d]
Row 40 RepRow 39. [22 sts]
Row 41 Knit.
Row 42 K1,kfb,knittothe last 2 sts, kfb, K1. [24 sts]
Rows 43 to 45 Knit.
Row 46 K1,k2tog, knit to the last 3 sts, k2tog, K1. [2 sts dec’d]
Row 47 Knit.
Rows 48 to 51 Rep Rows 46 to 47 twice more. [18 sts]
Castoff.

BEEBODY(MAKE1)
Caston7 stsusing3.25mm needles and Yarn A.
Row 1 (WS)Purl.
Row 2 K1,(kfb) 6 times. [13 sts]
Row 3 Purl.
Row 4 K1,(kfb, K1) 6 times. [19 sts]
Row 5 Purl.
Row 6 K1,(kfb, K2) 6 times. [25 sts]
Row 7 Purl.
Row 8 K1,(kfb,K3)6 times.[31sts]
Workfollrowsinstripes of Yarn A and Yarn D.
Row 9 P31D.
Row 10 K31 D.

EASY TO KNIT

YarnKCyan(397)
YarnLCandleLight(101)
QA pairof3.25mm needles
QToyfilling
QA 15cmembroideryhoop
Q6x6mmdiameterblackbuttons
andsewingneedle and thread
QSuperglue
Foryarnstockists contact
Scheepjes
http://www.scheepjes.co.uk

TENSION
28 stsand 36 rowstomeasure
10x10cm(4x4in)overstocking
stitch using 3.25mm needles

ABBREVIATIONS
For a full list see page 95

TOPTIP
Whenlotsoflittlethings
makeupa biggerproject
you’llbenefitfromleaving
nicelongyarntailswhenyou
castonandoff– youcanuse
thesetosewupallthe
variousseamsniceand
securely to finish your piece.

Stuffthesuncentreandthensew
thesunraysaroundtheoutsideto
make the sun centrepiece
Free download pdf