Dalmia DSP Success Story

(Project Pridr) #1

30 PROjECT PRIDE



  1. Digital light processing video wall installed at CCR
    for better plant operation

  2. NI-CD batteries for UPS and battery charger
    installed

  3. Radiation pyrometers for tertiary air, secondary
    air, kiln I/L, clinker temperature and burning zone
    installed

  4. Vibration sensors considered for all air slide fans,
    root blowers, process fans, and critical nuisance bag
    filter fans

  5. 3-phase transformer for ESP considered for better
    emission control

  6. Three live load cells have been considered for mass
    flow balancing for hoppers

  7. Entire plant operation from CCR

  8. Online gear box condition monitoring system for
    VRM (coal mill)

  9. Online roller press bearing condition monitoring
    system

  10. Online broken bag detector for bag house

  11. Wireless radar-based anti-collision system for
    stacker and reclaimer

  12. Provision of kiln shell scanner system, having the
    features of:
    • Refractory management
    • Live ring migration
    • Brick coating thickness monitoring
    • Kiln thermal losses calculations

Free download pdf