Dalmia DSP Success Story

(Project Pridr) #1

36 PROjECT PRIDE


S. No. Action taken
(Equipment)

Benefits Locations

12 Provision of high
temperature
CCTV


  • To monitor live
    burning zone and
    temperature inside
    kiln

    • Kiln




13 Provision of VFD • Improves the
equipment reliability


  • Process fans,
    DPC, elevators,
    all inclined belt
    conveyors, bag
    filters above 15
    kW, e t c.
    14 Provision of
    sophisticated
    (synthetic oil)
    and automated
    lubrication
    system

  • Consistent equipment
    performance

  • At all
    equipment


D Productivity initiatives
1 Provision of
kiln slope at 4.5
degree


  • Productivity and
    energy conservation

    • Kiln




2 PH fan inlet
pressure at 350
mmwg


  • Productivity and
    energy conservation

    • Pre-heater




3 Increased
calciner size with
higher retention
time


  • Productivity and
    energy conservation

  • NOX generation can
    be reduced

  • Any hard burnt fuel
    and AFR’s can be
    fired in calciner

  • Higher petcoke
    residue can be
    maintained

    • Calciner




4 Provision of
Pfister pump


  • To have accuracy in
    material feed

    • Kiln feed, kiln,
      and calciner
      firing



Free download pdf