Dalmia DSP Success Story

(Project Pridr) #1

72 PROjECT PRIDE


shut downs of CCBC without affecting production planning
of existing plants. It was a challenging task to maintain the
pace for a long time to complete the upgradation work
within a permitted time period; lot of challenges were faced
during this period like material theft, local disturbance, etc.
With commendable work, the year 2018 proved to
be a very fruitful period for the team as the ordering
was completed, major engineering drawings released,
construction started with great enthusiasm – humungous
efforts and the initial stage set to achieve an ambitious
target.