Irrigation—Principles & Practices
Part 1 – 262 | Unit 1.5
Appendix 13: Sample Sprinkler & Drip Tape
Application Rate Calculations
Appendix 13: Sample Sprinkler & Drip Tape Application Rate
Sample sprinkler application rate
calculation
You determine your sprinkler risers put out
3.5 gpm (gallons per minute) at 60 psi
30 x 30 spacing = 64 risers per acre
64 risers x 3.5 gpm = 227.5 gpm
227.5 gpm x 60 = 13,650 gph (gallons per
hour)
There are 27,154 gallons of water
per acre inch
27,154 divided by 2 = 13,577 gallons
So, 13,650 gallons per hour =
approximately .5 inch application
rate per hour
If your application uniformity is 80% then
your application rate is closer to .4 inches
per hour (.5 x 80%)
Sample drip application rate
calculation
Flow rate: .75 gpm per 100 feet @ 8 psi
(from label)
Bed spacing 2 feet
Bed length 100 feet
218 beds per acre
218 beds x 100 feet = 21,800 bed feet
per acre
Total bed feet divided by 100 = 218
100-foot sections per acre
218 sections x .75 gpm (per 100 feet) =
163.5 gpm
163.5 gpm x 60 minutes per hour =
9,810 gph
9,810 gph = 2.76 hours to apply
one acre inch
27,154 gallons per acre inch divided by
9,810 gph = 2.76 hours