TOFG-all

(Marcin) #1
Tillage & Cultivation

Unit 1.2 | Part 1 – 85

Appendix 3 (cont.): French Intensive/Double-


Digging Sequence


Appendix 3: French-Intensive / Double-Digging Sequence


Step 5. After the final trench has been opened, compost applied,
and the bottom of the trench fractured, fill the last trench with the
soil from the wheelbarrow.


Illustration by José Miguel Mayo

Free download pdf