Setting Out Reduced Level Excavations ~ the overall outline of
the reduced level area can be set out using a theodolite, ranging
rods, tape and pegs working from a base line. To control the depth
of excavation, sight rails are set up at a convenient height and at
positions which will enable a traveller to be used.
Setting Out