By the end of Phase III (at 2050), Al-Auja International airport will be consisting of two
parallel runways, a full taxiing system, a two-floor terminal building with a gross area of
93,730 m^2 , and an apron area that accommodates 55 gates at the peak hour; at a total cost
of about 635 million dollars. Table 11- 4 provides detailed information about each item
description, unit price, and the total cost by the end of Phase III.Table 11 - 4Detailed Bill of Quantity BOQ-Phase III
Detailed Bill of Quantity BOQ
Al- Auja International Airport - Phase IIIItem Description Unit Quantity Unit Cost $ Amount ($)
1Left Runway
* Earthworks including excavation and backfill of subgrade material.
* Flexible Pavement Works1.1Earthworks
1 - Excavation (Cut) m3 6,018,557 4 24 , 074 , 228
2 - Fill (Backfill imported from the site) m3 500 6 3,0001.2Flexible Pavement (40cm)
1 - HMA (25cm) m2 1,670 65 108,550
2 - Base Course (15cm) m3 92,448 40 3,697,920
Subtotal 27,883,698^2Left Taxiway
* Earthworks including excavation and backfill of subgrade material.
* Flexible Pavement Works2.1Earthworks
1 - Excavation (Cut) m3 2,092,670 4 8,370,680
2 - Fill (Backfill imported from the site) m3 0 6 -2.2Flexible Pavement (40cm)
1 - HMA (25cm) m2 819 65 53,235
2 - Base Course(15cm) m3 43,243 40 1,729,720
Subtotal 26,894,995