URBAN RUNOFF 1199
TABLE 25
DAF design parametersOverflow Rate (gal/ft^2 /min)
Low rate 1.3–4.0
High rate 4.0–10.0Horizontal Velocity (ft/min) 1.3–3.8Detention Time (min)
Flotation cell range 10–60
Floating cell average 25
Saturation tank 1–3
Mixing chamber 1Pressurized Flow (% of total flow)
Split-flow pressurization 20–30
Effluent recycle pressurization 25–45
Air to Pressurized Flow Ratio
(standard ft^3 /100 gal)1.0Air to Solids Ratio 0.05–0.35Pressure in Saturation Tank (lb/in.^2 ) 40–70Float
Volume (% of total flow) 0.75–1.4
Solids concentration (% dry weight basis) 1–2
lb/in.^2 0.0703 kg/m^2.
(EPA-600/8-77-014).100100
1 0001 00010 00010 000100 000NOTE: 11^2 = 0.0626-m^3
Mgal/s = 0.0438-m^3 /sDISSOLVED AIR FLOTATION TANK SURFACE AREA, ft^2CONSTRUCTION COSTS, $ 1 000ESTIMATED 90 Mgal/d PLANT.
MAINTANENCE VISC [b]MACINE WIRE FACILITIES
INCLUDE PRETREATMENT [d]DERIVED FROM
COST CURVE [c]SAN FRANCISCO, CA [a]FIGURE 14 DAF construction costs: ENR 2,000 (EPA/600/8-77-014).TABLE 23
Percent removals achieved with screening/DAF (Milwaukee, WI)Without chemical
flocculant additionWith chemical
flocculant addition
BOD 5 35 8 60 11
COD 41 8 57 11
SS 43 7 71 9
Volatile SS 48 11 71 9
Nitrogen 29 14 24 9(EPA-600-77-069a).TABLE 24
Percent removals achieved with screening/DAF (Racine)Percent RemovalSite I Site IIBOD 5 57.5 65.4
TOC 51.2 64.7
SS 62.2 73.3
Volatile SS 66.8 70.9
Total Phosphorus 49.3 70.0(EPA-600/2-79-106a).C021_002_r03.indd 1199C021_002_r03.indd 1199 11/23/2005 9:45:48 AM11/23/2005 9: