292 ELECTROSTATIC PRECIPITATION
TABLE 1
Power plant
Coal-fired
boiler
Power plant
Coal-fired
boiler
Power plant
Coal-fired
boiler
Paper
mill Lime
reburning
Steam boiler
Stoker with
lime stone
Cement Plant
Kiln
Cement Plant
Kiln
Esp make Walther FLS miljφ FLS miljφ FLS miljφ FLS miljφ FLS miljφ FLS miljφ
Resistivity level High Medium Medium Low High High High
Energy savings 90% 91% 64% 84% 78% 70% 65%
Emission reduction 25% 33% 7% 0% 65% 57% 47%
FABRIC FILTER *
COLLECTION EFFICIENCY (%)
99.99
99.98
99.95
99.90
99.80
99.00
95.00
90.00
99.50
98.00
.5 (^125102050)
OPACITY %
CLEAR
STACK
UPGRADED PRECIPITATOR
SUSTAINED LOAD
FIGURE 14 Ravenswood Unit 3 plume opacity as a function of particulate collection system efficiency.^5
C005_005_r03.indd 292C005_005_r03.indd 292 11/18/2005 10:22:05 AM11/18/2005 10:22:05 AM