292 ELECTROSTATIC PRECIPITATION


TABLE 1
Power plant
Coal-fired
boiler

Power plant
Coal-fired
boiler

Power plant
Coal-fired
boiler

Paper
mill Lime
reburning

Steam boiler
Stoker with
lime stone

Cement Plant
Kiln

Cement Plant
Kiln
Esp make Walther FLS miljφ FLS miljφ FLS miljφ FLS miljφ FLS miljφ FLS miljφ
Resistivity level High Medium Medium Low High High High
Energy savings 90% 91% 64% 84% 78% 70% 65%
Emission reduction 25% 33% 7% 0% 65% 57% 47%

FABRIC FILTER *

COLLECTION EFFICIENCY (%)

99.99

99.98

99.95

99.90

99.80

99.00

95.00

90.00

99.50

98.00

.5 (^125102050)
OPACITY %
CLEAR
STACK
UPGRADED PRECIPITATOR
SUSTAINED LOAD
FIGURE 14 Ravenswood Unit 3 plume opacity as a function of particulate collection system efficiency.^5