Estimating in Building Construction

(Barré) #1

diameter, 100, 102
drilled piers, 104
epoxy coated, 100
foundation, 102–103
grade beams, 105
labor, 105
lap, 100
masonry, 126, 130–131
mesh, 116–117
number, 100
productivity rates, 106
shop fabricated, 100, 102
slab, 103–104
splice, 100, 102
steel, 34
summary sheet, 106
tile, 128
weight, 100, 102
workup sheet, 105–106
Rental cost, 45, 64
Repairs, 50, 64
adjoining structures, 50
street, 50
Reporting services, 29
Reports custom, 39
Reputation
damage to, 58
professional, 13
Residential, 6
Resilient
flooring, 208
tile, 209
Resources managing, 54
Responsibility of
bidders, 23
Retarder, 109
Retention, 14
Retirement contributions, 58
Revolving doors, 192
Ridge, 167–168
roof, 181, 183
Ridged insulation, 175
roofing, 184
wall, 202, 204
Riprap stone, 128
Risk, 7, 11–12, 15, 18, 32,
57, 224–225
distribute, 4
Road, 76, 79
conditions, 31
grading, 55
paving, 55
striping, 55
Rock excavation, 88
Roller, 90
Rolling grills, 192
Roof
cants, 180
collar ties, 167
curbs, 180, 182
felt, 182
flashing, 180, 182


freeformed, 184
hip, 181, 183
lookouts, 168
pitch, 166, 168, 181
ridge, 167–168, 181, 183
shapes, 180
sheathing, 168
slab, 109
slope, 166, 168, 181
tile, 183–184
wood, 166–168
workup sheet, 169
Roofing, 180–184, 227
asphalt, 182
bond, 182
built-up, 182
cements, 182
checklist, 185
felt, 168, 181, 184
flashing, 183–184
insulation, 182, 184
labor, 185
liquid, 184
metal, 183
productivity, 181
slate, 183
subcontractor, 180–182, 185
trim, 182–185
Rough
carpentry, 145, 227
grade, 67–78, 87
R.S. Means, 3, 55–56, 60, 228–231
Rubber base, 209
R-value, 179

S
Saddles, 194
Safety, 39, 58
requirements, 24
Salaries, 28, 43, 45, 224
Sale, bill of, 14
Sales
price, 14
tax, 33, 39, 51, 63
Salvage value, 62
Sandblast, 108–109
Sanitary facilities, 46
Scaffolding, 34, 65, 108–109,
119, 134, 177–178,
184–185, 189, 201, 205
Scale, economies of, 226
Schedule, 7, 28, 30–31,
45, 47–49
door, 192
finish, 209
hardware, 192
network, 47
of values, 14
Scheduling program, 47
Scope of work, 1, 2, 12, 14, 33
Scrap value, 62
Scrapers, 67, 85, 87

Scratch coat, plaster, 204
Screed chairs, 108
Screens, window, 186, 189
Screws, drywall, 202
Sealer, 109–111
Secretary, 43, 48
Sections, wall, 30, 93
Security personnel, 45, 48
Separate contracts, 30, 66
electrical, 214–215
HVAC, 221
plumbing, 218, 220
Shaft, 96
Shakes, 182
Sheathing
floors, 154–155
roof, 168
tongue and groove, 154
wall, 162–163
Sheet piling, 66, 81–82
Shingles
asphalt, 181
wood, 181–182
Shop drawings, 5, 24
doors, 192
form, 113
precast, 117–118
reinforcing, 100
window, 186
Shoring, 24
Shrinkage, 67, 70, 87
Shrubs, 88
Sick leave, 58–59
Sidewalk, 92, 109
Siding, 227
Signal lights, 49
Signs, project, 24, 46, 49
Silicone waterproofing, 177
Sill
drop, 192
masonry, 132
window, 186, 189, 227
wood, 146–148
Single contract, 66
electrical, 214–215
HVAC, 221
plumbing, 218–219
Single tee, precast 115–116
Site access, 31
drainage, 31
grades, 67–78
investigation, 81
plan, 66, 68, 84, 93
sample, 69
visit, 23, 30–31, 50
Size of project, 29–30
Sketch
decking, 154
flooring, 209
roof sheathing, 168
window sill, 189
Skylights, 185

INDEX 269
Free download pdf