Structural Engineering

(nextflipdebug5) #1

Draft


12.1Introduction 199


If we considerthefollowing:



  1. Anunstressedsteelcableof lengthls

  2. A concretebeamof lengthlc

  3. Prestressthebeamwiththecable,resultingin a stressedlengthof concreteandsteel


equaltol


0
s

=l


0
c

.



  1. Dueto shrinkageandcreep,therewillbe a changein length


lc= ("sh+"cr)lc (12.1)


we want to make surethatthisamoutof deformationis substantiallysmallerthanthe


stretch of thesteel(forprestressingto be e ective).



  1. Assumingordinarysteel:fs= 30ksi,Es= 29; 000 ksi,"s=


30


29 ; 000


= 1: 03  10


 3
in=in


  1. Thetotalsteelelongationis"sls= 1: 03  10


 3
ls


  1. Thecreepandshrinkagestrainsareabout"cr+"sh': 9  10


3



  1. Theresidualstreswhich is leftin thesteelaftercreepandshrinkagetookplaceis thus


(1: 03 :90) 10


 3
(29 10

3
) = 4ksi (12.2)

Thus thetotallossis


30 4


30


= 87%which is unacceptablytoo high.



  1. Alternativelyif initialstresswas 150ksiafterlosseswe wouldbe leftwith 124 ksior a


17%loss.


10.Notethattheactuallossis (: 90  10


 3
)(29 10

3
) = 26ksiin each case

9 Havingshownthatlosseswouldbe too highforlow strengthsteel,we willuse


Strandsusuallycomposedof 7 wires.Grade 250 or 270ksi,Fig.12.3.


NNNNNNNNNN


NNNNNNNNNN


NNNNNNNNNN


NNNNNNNNNN


NNNNNNNNNN


NNNNN


OOOOOOOOOO


OOOOOOOOOO


OOOOOOOOOO


OOOOOOOOOO


PPPPOOPOOPOOOOOO


PPPPPPPPPPPP


PPPPPPPPPPPP


PPPPPPPPPPPP


PPPPPPPPPPPP


PPPPPPPPPPPP


PPPPPP


QQQQQQQQQQQQ


QQQQQQQQQQQQ


QQQQQQQQQQQQ


QQQQQQQQQQQQ


QQQQQQQQQQQQ


QQQQRRQRRQRRRRRR


RRRRRRRRRR


RRRRRRRRRR


RRRRRRRRRR


RRRRRRRRRR


SSSSSSSSSS


SSSSSSSSSS


SSSSSSSSSS


SSSSSSSSSS


SSSSSSSSSS


TTTTTTTTTT


TTTTTTTTTT


TTTTTTTTTT


TTTTTTTTTT


TTTTTTTTTT


UUUUUUUUUU


UUUUUUUUUU


UUUUUUUUUU


UUUUUUUUUU


UUUUUUUUUU


VVVVVVVVVV


VVVVVVVVVV


VVVVVVVVVV


VVVVVVVVVV


VVVVVVVVVV


WWWWWWWWWW


WWWWWWWWWW


WWWWWWWWWW


WWWWWWWWWW


WWWWWWWWWW


XXXXXXXXXXXX


XXXXXXXXXXXX


XXXXXXXXXXXX


XXXXXXXXXXXX


XXXXXXXXXXXX


XXXXXX


YYYYYYYYYYYY


YYYYYYYYYYYY


YYYYYYYYYYYY


YYYYYYYYYYYY


YYYYYYYYYYYY


ZZZZZZZZZZZZ


ZZZZZZZZZZZZ


ZZZZZZZZZZZZ


ZZZZZZZZZZZZ


ZZZZZZZZZZZZ


ZZZZZZ


[[[[[[[[[[[[


[[[[[[[[[[[[


[[[[[[[[[[[[


[[[[[[[[[[[[


[[[[[[[[[[[[


Figure12.3: 7 WirePrestressingTendon


Tendonhave diametersrangingfrom1/2to 1 3/8of aninch. Grade 145 or 160ksi.


Wires comein bundlesof 8 to 52.


Notethatyieldstressis notwell de nedforsteelusedin prestressedconcrete,usuallywe take


1%strainas e ective yield.


10 Steelrelaxationis thereductionin stress atconstant strain(asopposedtocreepwhich


is reductionof strainat constant stress)occrs. Relaxationoccursinde nitelyandproduces

Free download pdf