(Project Pridr) #1

  • Note:

  • Saving for Preheater = Rs. 35,284/- per Annum

  • ROI Calculation:

  • Belt Conveyors:
    For 9000 TPD plant, there are 21 Major Belt Conveyors whose length is more
    than 50 Meter, if we consider 12 hours of illumination in night and out of which
    only 1 hour is utilized for normal inspection on daily basis, then 11 hours of idle
    illumination is there. So if we go for occupancy sensor for the same then there
    would be a huge saving on this account.


Equipment Detail Qty. UOM Cost per Qty. Total Cost

Overall
Cost
(INR)

Annual
Saving
(INR)

ROI


(Years)
Sensor 5 Nos. 7000 35000

Cable 500 Mtr. (^1005000011000035284) 3.1
Erection Cost (Cable



  • Sensor)^1 Set^2500025000
    S. N. Main Panel
    Room
    Sub
    Location
    36 Watt Well
    Glass LED Light Idle
    Hour /
    Month
    Energy
    Consumption
    (KwH
    Total Energy
    Consumption
    (KwH)/
    Monthly
    Occupancy
    Sensor
    Total Qty. Normal Qty. Required
    (^1) Pre Heater
    Building
    Ground
    Floor to 6th
    Floor
    50 45 330 534.6 534.6 5
    Total Unit Consumption per month 534.60 5
    Total Unit Consumption per Annum 6,415.20
    Annual Saving ` 35,283.60
    S. N. Belt Conveyor
    Equip.No
    Detail
    Belt
    Length
    in Mtr
    36
    Watt
    Wel
    Glass
    LED
    Light
    Idle Hr./
    Month
    Energy
    Consumption
    (KwH)/
    Month
    Occupancy
    Sensor
    Required
    1 BC B TT-1A Exiting Mines to Crusher Building 63 6 330 71 3
    2 BC D Sacrificing Belt Conveyor Below LS Crusher to TTB 53 6 330 71 2
    3 BC E TTB to TTC 192 15 330 178 8