technical NOTES

(Project Pridr) #1
Guided Steel Chimney with RCC Framed Structure
MS stack (05 M Diameter) of 110 M height guided with 4 nos.
RCC column 10m C/C and tie beam
S. N. Description No. Length (M) Width(M)

Height /
Thickness
(M)

Qty.
(M3)

Rate
(in
INR)

Amount
(in
Lakhs)
Total 886 16500 146
11 MS Stack weight for 110 M height (MT) 1 230 80000 184
12 Structural Steel staircase - 1 40 78000 31
Amount in Lakhs 361


  • Note: Operating cost shall be validated with present condition



  1. Steel Stack-Chimney Guided with Str. Steel cantilever bracket in PH tower



  • Note: Operating cost shall be validated with present condition


Chimney Guided with Pre-Heater Cantilever Structure Tie Beam in Recent Projects
MS Stack (05 M Diameter) of 186 M height guided with structural steel bracket
with PH column and beam

S. N. Description No. Length (M) Width(M)

Height /
Thickness
(M)

Qty.
(M3)

Rate
(in
INR)

Amount
(in Lakhs)
1 Footing 2 3.6 3 1 22 16500 4
2 Column up to 0.00 2 0.8 0.8 3 4 16500 1
3 Column up to 10.21 2 0.8 0.8 10.21 13 16500 2
4 Tie Beam at 10.21 3 10.4 1 1 31 16500 5
5 MS Stack Foundation RCC 60 16500 10

6

Other tie beam
at different levels
are made with
Structural steel
cantilever bracket at
level 41.214 M, 83.614
M, 118.614M ,139.214 M
(MT) & Insert plate

140 78000 109

7

Qty. of MS stack
Structural steel 186.00
M height (MT) in-
cluding supporting
structure

358 80000 286

Amount in Lakhs 417
Free download pdf