350 Energy Project Financing: Resources and Strategies for Success
ducers for use in the Texas LoanSTAR Program,” Proceedings of the 1992
Hot and Humid Conference, Texas A&M University, Energy Systems
Laboratory Report No. ESL-PA-92/02-15.
18 Claridge, D., Haberl, J., Bryant, J., Poyner, B. and McBride, J. 1993.
“Use of Energy Management and Control Systems for Performance
Monitoring of Retrofit Projects,” Final Summary Report, USDOE Grant
#DE-FGOI-90CE21003, Submitted to the USDOE Office of Conservation
and Energy, Energy Systems Laboratory Report ESL-TR-91/09/02, Texas
A&M University, March.
19 Claridge, D., Haberl, J., Liu, M., Houcek, J. and Aather, A. 1994. “Can
You Achieve 150% of Predicted Retrofit Savings? Is it Time for Recom-
missioning?,” Proceedings of the 1994 ACEEE Summer Study, pp. 5.73-
5.88, August.
20 Claridge, D., Haberl, J., Liu, M. and Athar, A. 1996. “Implementation of
Continuous Commissioning in the Texas LoanSTAR Program: Can you
Achieve 150% of Estimated Retrofit Savings: Revisited,” Proceedings of
the 1996 ACEEE Summery Study, August.
21 Cortina, V. (ed.) 1988. “Precision Humidity Analysis,” EG&G Environ-
mental Equipment, 151 Bear Hill Road, Waltham, Massachusetts, (IR
sensors).
22 Doebelin, E. 1990. Measurement Systems. McGraw-Hill, New York, New
York, ISBN 0-07-017338-9.
23 EEI 1981. Handbook for Electricity Metering, Edison Electric Institute,
Washington, D.C., ISBN-0-931032-11-3.
24 EPRI 1993. “Fundamental Equations for Residential and Commercial
EndUses” (Rep. #EPRI TR- 100984 V2). Palo Alto, California: Electric
Power Research Institute.
25 Fels, M. (ed.)l 986. “Special Issue Devoted to Measuring Energy Savings,
The Princeton Scorekeeping Method (PRISM),” Energy and Buildings,
Vol. 9, Nos. 1 and 2.
26 Fels, M., Kissock, K., Marean, M.A. and Reynolds, C. 1995. “Advanced
PRISM User’s Guide,” Center for Energy and Environmental Studies
Report, Princeton University, Princeton, New Jersey, January.