Untitled

(Brent) #1
3 Link both Wingman01 and Wingman02 to SpaceshipControl.

Add a path constraint to the dummy:

1 In the Top viewport, use Zoom Extents to view the scene.

2 Click Select Object to turn it on and turn off Select And Link.
3 Select SpaceshipControl.

4 From the Animation menu, choose Constraints > Path Constraint. Drag
the cursor and click the flightpath.
SpaceshipControl jumps to the beginning of the path. The spacefighters
follow along since they're linked to the dummy.

520 | Chapter 4 Animation Tutorials
Free download pdf