Architectural Design

(singke) #1
1st ProofTitle: BA: Architectural Design
Job No: PD0710-67/3184

Chapter 1 final_.qxd:layouts to chapter one 7/23/10 8:51 PM Page 20


Case study

The design studio

Architectural Association: student pavilions

The Architectural Association holds an annual Projects
Review exhibition at the end of the academic year. This
provides an opportunity for the school to display their
students’ work and connect to the wider profession.
This case study documents some of the recent pavilions
designed, built and exhibited by the Architectural
Association at the Projects Review.

The projects

Between 2006 and 2009, second- and third-year students
in Intermediate Unit 2 built a series of pavilions in the square
outside the Architectural Association. The projects were
developed over the course of the academic year. Students
were encouraged to contribute an idea every time the
group met to progress the design. The most successful
proposals were shortlisted for more detailed development,
with students working in small groups to explore the viability
of each option. Eventually one design was chosen to be
progressed towards construction. Testing and construction
of the project involved the whole unit and tutors collaborating
in a manner similar to an architectural office, with consultant
engineers, material specialists and technicians giving
expert advice.
The brief for the pavilions keeps the programmatic
requirements relatively simple. Function is not prescribed
beyond the pavilion’s role as a focal point and space
enclosure. Shelter and seating provision are not
prerequisites. This looseness allows the designer to focus
on their own preoccupations and conceptual direction.
They also explored the possibilities of emerging digital
design and manufacturing techniques, and the potential
of innovative timber construction. Live student projects are
excellent ways to push the boundaries of what is considered
possible because educational environments can sometimes
offer the time and freedom to experiment and explore
solutions that may be dismissed as inefficient or risky
in a professional environment.

1st ProofTitle: BA: Architectural Design
Job No: PD0710-67/3184
Text

Chapter 1 final_.qxd:layouts to chapter one 7/23/10 8:18 PM Page 20

Free download pdf