Project Finance: Practical Case Studies

(Frankie) #1

CONTENTS


vii



  • Introduction Foreword xi

  • The nature of project finance

  • Trends in project finance

  • Effect of Enron

  • Caution among lenders and investors

  • Common themes

  • Reasons for financial difficulty

  • Lessons learned

  • 1 Laibin B– Coal fired power plant Power plants

    • Introduction

    • Project summary

    • Background

    • How the financing was arranged

    • Government approvals and support

    • Risk analysis

    • Principal contracts

    • Lessons learned



  • 2 Meizhou Wan – Pulverised-coal-fired power plant

    • Introduction

    • Project summary

    • Background

    • Principal contracts

    • How the financing was arranged

    • Lessons learned



  • 3TermoEmcali– Gas-fired power plant

    • Project summary

    • Project economics

    • Ownership and contractual relationships

    • Financing structure

    • Risk analysis

    • Structure of financing

    • Lessons learned vi



  • 4 Azito – 288 MW power plant and 225 kV transmission system

    • Project summary

    • The power sector in Côte d’Ivoire

    • Project description

    • Project risk factors

    • Critical success factors and lessons learned



  • 5 Dabhol Power Company – Power station and port facilities

    • Project summary

    • Background

    • Lessons learned



  • 6 PT Paiton Energy (Paiton I) – Coal-fired power plant

    • Project summary

    • Background

    • Lessons learned as of

    • Developments since

    • Lessons learned as of



  • 7 Samalayuca II– Power plant

    • Introduction

    • Project summary

    • Background

    • Lessons learned



  • 8 Merida III – Power plant

    • Introduction

    • Project summary

    • Background

    • Lessons learned



  • 9 Bajio, La Rosita and TEG – Natural-gas-fired power plants

    • Introduction

    • Mexican power projects following Samalayuca II and Merida III

    • Bajio

    • La Rosita I and II

    • TEG I

    • TEG II

    • Fuel supply issues

    • Future structure of the Mexican power industry

    • Lessons learned



  • 10 CBK– Hydroelectric power plant and pumped storage facility

    • Project summary

    • Background

    • Arrangement of finance

    • Project debt service coverage ratios

    • Political risk insurance

    • Lessons learned



  • 11 Quezon Power – Pulverised-coal-fired power plant

    • Project summary

    • Background

    • How the financing was arranged

    • Principal project contracts

    • Description of additional agreements

    • Other project documentation

    • Risk factors

    • Lessons learned



  • 12 Drax – Coal-fired power plant

    • Project summary

    • Power plant description

    • Background

    • How the financing was arranged

    • Sources and uses of funds

    • Independent consultants’ reports

    • Initial credit ratings

    • Subsequent developments

    • Lessons learned



  • 13 Panda Energy–TECO Power joint venture – Two natural-gas-fired power plants

    • Project summary

    • Background

    • Credit and risk management

    • Contracts

    • How the financing was arranged

    • Environmental permits

    • Risk summary

    • Financial projections

    • Subsequent developments

    • Lessons learned



  • 14 Calpine – Power plant portfolio Power project portfolio

    • Summary of approach to projects

    • Background



Free download pdf