stepplot(So)
The plot indicates that it takes approximately 15 seconds to reject a step disturbance at
the plant output, y1.
Obtain Linearization Offsets
When batch linearizing for parameter variations, you can obtain the linearization offsets
that correspond to the linearization operating points. To do so, set the StoreOffsets
linearization option in the slLinearizer interface.
sllin.Options.StoreOffsets = true;
Vary Parameter Values and Obtain Multiple Transfer Functions