For more information on this system, see [1].
Introduction to Gain Scheduling
A common approach to solve the nonlinear control problem is using gain scheduling with
linear controllers. Generally speaking, designing a gain scheduling control system takes
four steps:
(^1) Obtain a plant model for each operating region. The usual practice is to linearize the
plant at several equilibrium operating points.
Design Family of PID Controllers for Multiple Operating Points