486 Questions 20.7-20.70: design of underground excavations
It is considered that the backfill will offer sufficient support to prevent
degradation of the side walls of a stope, and that the only stress-induced
failure of concern is that in the crown. What is the maximum permissible
height of a stope in these circumstances?