298 Pile groups under compressive loading
Layer 2Layer 3aLayer 3bTotal 69 mmSimilarly, for L/B10 the uncorrected settlements are
Layer 1 19 mm
Layer 2 9 mm
Layer 3 21 mm
Total 49 mmBy interpolation the settlement for L/B 1.3 is 66 mm
Effective overburden pressure at base of raftFrom equation 5.36From equation 5.37Corrected settlement at 25 years say between
50 and 70 mmExample 5.4
Nuclear reactors, their containment structures, and ancillary units weighing 900 MN are to
be constructed on a base 7032 m sited on 8 m loose to medium-dense sand overlying a
moderately strong sandstone. Rotary cored boreholes showed that below a thin zone of weak
weathered rock the RQD value of the sandstone was 85% and the average unconfined
compression strength was 14 MN/m^2. Design a suitable piled foundation and calculate the
settlement.
Overall loading on baseUnder this loading the settlement of the sand will be excessive. A piled foundation is
required and relatively few large-diameter piles will be more economical than a large
number of lightly loaded piles.
Adopt piles 1.5 m in diameter taken 2 m below weak weathered rock on to the moderately
strong sandstone. It will be possible to permit loading of the concrete forming the bored
900
70 32
0.402 MN/m^20.621.48 6661 mmC 21 0.2lg 25
0.11.48
C 11 0.5^214
278
0.62
9.81[(21.9)(100.9)(100.9)] 214 kN/m^2278 0.410.31 000
50 1 000
23 mm278 0.462.51 000
50 1 000
6 mm278 0.365.21 000
40 1 000
13 mm