Pile Design and Construction Practice, Fifth edition

(Joyce) #1

the ultimatedead load corresponding to the selected pick-up point is then read off from the
appropriate curve. Next the ultimate dead load bending moment is compared with the
ultimate moments of resistance for various sizes of reinforcement as shown on the charts
and the appropriate reinforcement is selected. A partial safety factor of 1.4 on the bending
moment due to dead load is suitable for normal designs, and this value has been used in the
derivation of Figure 7.2 and Table 7.2.
It is evident that there is a maximum lifting length for a pile of given cross-sectional
dimensions and size of main reinforcement. The design curves shown in Figure 7.2 have
been used to obtain the maximum lifting lengths for the three pick-up conditions for square
piles in Table 7.2. Also shown in these tables are the requirements for the link steel over a
length equal to three times the pile width at the head and toe, and in the body of the pile, in
accordance with BS8004.
The reinforcement stress and bar spacing previously referred to ensure that, from
considerations of exposure and durability, a surface crack width of 0.3 mm is not exceeded.
This is permitted by EC2 (Clause 7.3.1) for concrete in foundations in non-aggressive soil,
in wet or rarely dry conditions, and for concrete exposed to sea water including splash zone.
Requirements for cover to reinforcement in aggressive environmental conditions, as
recommended by EC2, are discussed in Chapter 10.


378 Structural design of piles and pile groups


010203040
Length of pile (m)

010203040
Length of pile (m)

0

40

80

120

160

200

240

B C

Arrangement of
reinforcement

Design bending moment,

kNm

240
200
160

120
80

40
0

280
240
200
160

120
80
40
Ultimate r 0

esistance moment with

Design bending moment,

kNm

Ultimate r

esistance moment with

0

40

80

120

160

200

240

280

pick up at A

300  300 mm 350  350 mm
4  25 mm f

4  25 mm f

4  32 mm f

4  20 mm f

4  20 mm f
Pick up at A

Main
bars

40 mm
cover
to links

0.2L

0.5L0.5L

0.33L 0.6L0.2L
Pick up B Pick up C

Pick up A

0 5 10 15 20 25 51015202530
Length of pile (m) Length of pile (m)

0

B C B C

35

80

60
40
20

Design bending moment,^0

kNm

4  32 mm f

Ultimate r

esistance moment with

Ultimate r

esistance moment with
Design bending moment,

(^80) kNm
60
40
20
(^00)
20
40
60
80
100
0
20
40
60
80
100
(a) (b)
(c) (d)
Pick up at A
400  400 mm
Pick up at A
400  40 mm f
4  32 mm f
4  25 mm f
450  450 mm
4  40 mm f
4  25 mm f
L
Figure 7.2Diagrams showing required lifting points for reinforced concrete piles of various cross-sections