Figure 11.16Testing rig for uplift on H-section pile using ground reaction.
Bracket welded
Load cell to test pile
Hydraulic jack
Angle bracing Universal beamsStiffenersTimber crib
Dial gaugeDial gauge Supports
Test pile
(Min 2 m)3 B BFigure 11.15Uplift load on test pile (ML test) (a) Load/uplift curve (b) Time/uplift curve.
25(a)Uplift of pile head in mmUplift load on pile head in MNUplift of pile head in mm2015105025(b)2015105(^012345678)
0
0
0.3
0.6
1.0
1.3
1.6
1.85
0
Total elapsed time in hours
0.5 1.0 1.5 2.0
0.8
Figures denote
increment of load
on pile