Figure 11.16Testing rig for uplift on H-section pile using ground reaction.
Bracket welded
Load cell to test pile
Hydraulic jack
Angle bracing Universal beams
Stiffeners
Timber crib
Dial gauge
Dial gauge Supports
Test pile
(Min 2 m)
3 B B
Figure 11.15Uplift load on test pile (ML test) (a) Load/uplift curve (b) Time/uplift curve.
25(a)
Uplift of pile head in mm
Uplift load on pile head in MN
Uplift of pile head in mm
20
15
10
5
0
25(b)
20
15
10
5
(^012345678)
0
0
0.3
0.6
1.0
1.3
1.6
1.85
0
Total elapsed time in hours
0.5 1.0 1.5 2.0
0.8
Figures denote
increment of load
on pile