Highway Engineering

(Nandana) #1

196 Highway Engineering


Penetration Load
(mm) (kN)
2 11.5
4 17.6
6 22.2
8 26.3
10 30.3
12 33.5

Table 7.1Standard
force-penetration
relationship
(CBR =100%)

Example 7.1
A CBR test on a sample of subgrade yielded the data shown in Table 7.2.

Determine the CBR of the subgrade.
Solution

Penetration Load
(millimetres) (kN)
0.5 1.6
1.0 3.3
1.5 4.9
2.0 6.6
2.5 8.2
3.0 9.3
3.5 10.5
4.0 11.4
4.5 12.2
5.0 13.0

Table 7.2Laboratory
CBR results of sample

2

4

6

8

10

12

14

0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0

8.2 kN

13.0 kN

Figure 7.4CBR curve for subgrade sample tested.
Contd
Free download pdf