Highway Engineering

(Nandana) #1
Example 2.4 Contd

30 Highway Engineering


Destination
Origin Z1 Z2 Z3 Z4
Z1 0 498 2682 645
Z2 197 0 1303 174
Z3 450 460 0 1191
Z4 129 106 1140 0
Amended 776 1064 5125 2010
inbound flows
Forecasted 700 1000 5500 1800
inbound flows
Destination 0.90 0.94 1.07 0.90
growth factor

Table 2.10Production
of third revised matrix
and further revision of
destination growth
factors

Destination Amended Forecasted
outbound outbound Growth
Origin Z1 Z2 Z3 Z4 flows flows factor
Z1 0 468 2878 578 3924 3825 0.98
Z2 178 0 1399 156 1733 1675 0.97
Z3 405 432 0 1066 1903 2100 1.10
Z4 117 100 1223 0 1440 1375 0.96

Table 2.11Production of fourth revised matrix and further revision of origin growth factors

Destination
Origin Z1 Z2 Z3 Z4
Z1 0 456 2805 563
Z2 172 0 1352 151
Z3 447 477 0 1176
Z4 111 95 1168 0
Amended 730 1028 5325 1890
inbound flows
Forecasted 700 1000 5500 1800
inbound flows
Destination 0.96 0.97 1.03 0.95
growth factor

Table 2.12Production
of fifth revised matrix
and further revision of
destination growth
factors

Destination Amended Forecasted
total total Growth
Origin Z1 Z2 Z3 Z4 origins origins factor
Z1 0 444 2897 536 3877 3825 0.987
Z2 165 0 1396 144 1705 1675 0.983
Z3 428 464 0 1120 2012 2100 1.044
Z4 107 92 1207 0 1406 1375 0.978

Table 2.13Production of sixth revised matrix and final required revision of origin growth
factors (sufficient convergence obtained)