Table 4.1 Flood, wind and wave standards by dam category (ICE, 1996)
Reservoir design flood inflow
Initial reservoir
Minimum standard
Concurrent wind speed
Dam
Potential effect of
condition
General
if overtopping is
and minimum wave
category
a dam breach
standard
tolerable
surcharge allowance
a
Where a breach could
Spilling long-term
Probable maximum
10 000-year flood
Mean annual maximum
endanger lives in a community
average inflow
flood (PMF)
hourly wind speed
b
Where a breach
Just full
10 000-year flood
1000-year flood
Wave surcharge
(i) could endanger lives not
(i.e. no spill)
allowance not less
in a community or
than 0.6 m
(ii) could result in extensive
damage
c
Where a breach would pose
Just full
1000-year flood
150-year flood
Mean annual maximum
negligible risk to life and
(i.e. no spill)
hourly wind speed
cause limited damage
Wave surchargeallowance not lessthan 0.4 m
d
Special cases where no loss
Spilling long-term
150-year flood
Not applicable
Mean annual maximum
of life can be foreseen as a
average inflow
hourly wind speed
result of a breach and verylimited additional flood damage
Wave surchargeallowance not less
would be caused
than 0.3 m