0.92 m^3 s^1
2.23 106 m^3 per 4-week period.
Improved accuracy in calculating the required reservoir capacity can
be achieved by plotting the net cumulative mass curve (Fig.
12.25(b)), which gives the capacity as 4.52 106 m^3. The continuous
Worked examples
Fig. 12.25 Mass curves