Engineering Economic Analysis

(Chris Devlin) #1
Arithmetic Gradient 103

two components:


,100
t
0~1--'-'---'-2---'---3~4

200

t


400

TI


200

t


300

J


A=100 +100(AjG, 6%, 4)= 100+ 100(1.427) ..'$242.70

:: .;;;, :iiiiii ~ -",.,,-~II!! ...~:;;~J, i


The equiyalent unifonn annualmafntenan,ceCosti$$242.70.
-- :.0-_ -..-

A textile mill in India installed a number of new looms. It is expected that initial maintenance
costs and expenses for repairs will be high but will then decline for several years. The projected
cost is:

Maintenance and
Year Repair Costs (rupees)
1 24,000
2 18,000
3 12,000
4 6,000

What is the projected equivalent annual maintenance and ,repair cost if interest is 1O%?

=

The projecte~fcashflowis not in the fonn of the arithmetic gradient factors.Both factors were


derived for an increasing gradient overtime. The factors cannot be uSed directly for a decpning