Handbook of Civil Engineering Calculations

(singke) #1

Applying the specified bearings, draw the horizontal projections AC and BD of the bore-
holes in Fig. 21 a.



  1. Locate the points of intersection with the hanging wall and
    footwall in elevation
    In Fig. 276, draw an elevation normal to the borehole through A; locate the points of in-
    tersection H 0 and F 0 with the hanging wall and footwall, respectively. Select the horizon-
    tal plane through A as datum.
    3. Repeat the foregoing construction with respect to borehole
    through B
    This construction is shown in Fig. 21 c.
    4. Locate the points of intersection in plan
    In Fig. 21 a, locate the points of intersection. Draw lines H 0 H 17 and F 0 F^ The former lies
    in the hanging wall and the latter in the footwall. To avoid crowding, reproduce the plan
    of line H 0 H,, in Fig. 27 d.
    5. Draw the plan of a line HbG that is parallel and equal in length
    to FaFb
    Do this by applying the second principle given above. In accordance with principle a,


FIGURE 27


(Q) Plan

(d) Plan
Free download pdf