I.9Index terms Links
Buoyancy 6. 2
Archimedes' principle in determining 6. 3center of 6. 6metacentric height and 6. 6 6. 7Business operations, analysis of 9. 63
dynamic programming in 9. 67linear programming in 9. 63optimal inventory level 9. 69project planning using CPM/PERT 9. 77Butt splice 1. 81
C
Cable(s):
catenary 1. 18with concentrated load 1. 15 1. 17 1. 30parabolic 1. 17Cantilever bulkhead analysis 4. 17
Cantilever retaining wall 2. 46
Cantilever wind-stress analysis 1. 188
Capacity-reduction factor 2. 4
Capital, recovery of 9. 8
Cardboard, corrugated, in municipal waste 4. 34
Cash flow calculations 9. 14
Celestial sphere 5. 12
Centrifugal pump(s) 6. 36 6. 63 6. 49
cavitation-free operation of 6. 40characteristic curves for series installation 6. 30 6. 31cost reduction for:maintenance for 6. 52energy consumption and loss 6. 81