I.13Index terms Links
Concrete, modulus of elasticity of 1. 157 1. 160
Concrete, prestressed (see Prestressed concrete beam(s))
Concrete, reinforced (see Reinforced concrete beam(s))
Conjugate-beam method 1. 57
Connection:
beam-to-column (see Beam connection)horizontal shear resisting 1. 98 1. 161 1. 162pipe joint 1. 82riveted 1. 98 1. 172semirigid 1. 171timber 3. 8welded 1. 78 1. 86 1. 87- 140 1. 144 1. 175
Connectors, shear 1. 162
Contaminants, soil (see Soil: contaminated)
Contaminated waste cleanup (see Cleanup technology)
Continuity, equation of 6. 8
Converse-Labarre equation 4. 29
Copper wire, in municipal wastes 4. 34 4. 35
Cost vs. benefit analysis 9. 61
Coulomb's theory 4. 13
Cover plates:
for highway girder 5. 54for plate girder 1. 97for rolled section 1. 97Critical depth of fluid flow 6. 20
Critical-path method (CPM) in project planning 9. 77
Culmination of star 5. 14
Curve:
circular 5. 14