Project #:Date:Prelimary LEED Review (If Applicable)Design Professional:
Project Title:
Space Program Signed Off By DeptTelecom SurveyElectrical SurveyArchitectural Schematic Design DrawingsCode Analysis
(Exiting, Toilet Facilities, Occupancy Load, Occupancy Type)SCHEMATIC DESIGN: Required Deliverables Checklist (25%)
ITEMNarriativeMechanical SurveyDesign SchedulePreliminary Cost Estimate (Including FFE)COMMENTSThe Schematic Design documents illustrate the general scope of the project and the relationships of the major
project components. They are typically conceptual in nature and are generally presented as a single-line type
drawing showing the type of construction, materials and provide a visual organization of the overall project.
November 1, 2016