Project #:Date:DESIGN DEVELOPMENT: Required Deliverables Checklist Design (50%)Professional:Project Title:LEED Application and Preliminary Review Response (If AppliableAll Rooms Have UIHC Assigned Room NumbersArchitectural Design Development Drawings
Mechanical Design Development Drawings
Electrical Design Development Drawings
Communication Design Development DrawingsInterior Finish Color / Material Presentation BoardsUpdated Project Schedule with anticipated Construction DurationUpdated Basis of Design Document with SummaryUpdated Space ProgramUpdated Code Analysis with SummaryCOMMENTS
The Design Development documents should develop and refine the schematic design documents giving more detail and
information. The A/E shall provide documents that fix and describe the size and character of the entire project.ITEM
Updated Construction Cost EstimateCutsheets for all proposed equipment/ furnitureCutsheets for all proposed M/E/P fixturesSpecification Arch & MEPCompleted Room Data SheetsNovember 1, 2016