Disconnect the solenoid valve connector.
Measure the resistance between the following
solenoid valve connector terminals.
(See SOLENOID VALVE INSPECTION .)
- Terminals EJ (shift solenoid A)
- Terminals FJ (shift solenoid B)
- Terminals HJ (shift solenoid C)
- Terminals IJ (shift solenoid F)
- Terminals KJ (pressure control solenoid)
Are the resistances normal?
(w) RX-8 Transmission (Manual & Auto)