RX8--Transmission (Manual & Auto)

(WallPaper) #1
Solenoid valve Harness color
Shift solenoid A Orange
Shift solenoid B Blue
Shift solenoid C Green
Shift solenoid F Red
TCC solenoid Yellow


  1. Install the fix plate.


Tightening torque

o 6.98.8 N·m

{7189 kgf·cm, 6277 in·lbf}


  1. Connect the solenoid valve connector.

  2. Install the oil pan and new gasket to a new oil pan installation bolts.


Tightening torque

o 7.09.0 N·m

{7291 kgf·cm, 6378 in·lbf}


  1. Connect the negative battery cable.

  2. Install the battery cover.

  3. Install the engine cover. (See ENGINE COVER REMOVAL/INSTALLATION .)

  4. Add ATF and, with the engine idling, inspect the ATF level and inspect for leakage. (See AUTOMATIC
    TRANSMISSION FLUID (ATF) REPLACEMENT .) (See Automatic Transmission Fluid (ATF) Level
    Inspection .)

  5. Perform the time lag test and line pressure test. (See MECHANICAL SYSTEM TEST .)

  6. Perform the road test. (See ROAD TEST .)


(w) RX-8 Transmission (Manual & Auto)
Free download pdf