Engineering Design with SOLIDWORKS® 2016 Fundamentals of Drawing


An Engineering Change Order (ECO) or Engineering Change Notice (ECN) is written for


each modification in the drawing. Modifications to the drawing are listed in the Revision
Table.


Obtain the ECO number before you institute the change to manufacturing.


Revision Table


The Revision Table provides a drawing history. Changes to the document are recorded


systematically in the Revision Table. Insert a Revision Table into the GUIDE drawing.


The default columns are as follows: Zone, Rev, Description, Date and Approved.


Zone utilizes the row letter and column number contained in the drawing border.
Position the Rev letter in the Zone area. Enter the Zone letter/number.


Enter a Description that corresponds to the ECO number. Modify the date if required.


Enter the initials/name of the engineering manager who approved the revision.


Activity: Revision Table

Insert a Revision ta ble.
356) Click None from the Layer drop-down menu.




  1. Click the Revision Table tool from the Consolidated
    toolbar in the CommandManager. The Revision Table
    PropertyManager is displayed. Accept the defaults.




  2. Click OK from the Revision Table
    PropertyManager. The Revision table is displayed in
    the top right corner of the Sheet.




  3. Zoom in on the first row in the table.