Cardiovascular Fitness Procedures Manual

(coco) #1
A debriefing session is held at the end of the retraining session to provide an opportunity for

group discussion and mutual feedback on this component including problem areas, unusual situations, and


any modifications in procedures. A Technician Competency Evaluation Form is completed for each


technologist and a Site Visit Report form is completed for each team.


Additional training is conducted throughout the year if necessary, depending on protocol

changes, technologist performance, and quality control reports.


6.3 Equipment and Room Set-up Checks


The equipment, room supplies, and room set-up need to be checked on a regular basis. Some

checks are completed daily and others need only be completed on a weekly basis or at the beginning of


each stand. These checks include calibration checks, maintenance inspection of equipment and supplies,


and preparation of the room and equipment for the session exams.


Each time you log on to the application, the system will remind you to do Quality Control

(QC) checks if the checks have not been completed for that time period. The checks are to be completed


daily, weekly, and/or every stand. If you do not have time to do the checks when you log on, you can


bypass this message and complete the checks at a later time. However, this message will be displayed


each time you log on until you have completed the checks for that time period. Once you have completed


the checks and entered this in the system, the message box with the reminder will not be displayed again


until the appropriate time period has passed.


The daily, weekly, and once-a-stand checks are listed in the following sections.

6.3.1 Daily


„ Confirm that the daily equipment checks are complete.


  • Turn on the power on the treadmill controller.

  • Turn on the power on the blood pressure (BP) monitor. (The Colin STBP-780 is
    the automated electronic heart rate and blood pressure monitor that will be used

Free download pdf