go through the first phase of the workday for group and team leaders, prior to
the shift.
The group leader (GL) is expected to arrive at work at least 30 minutes prior
to the start of production. The leader is expected to set an example in all areas,
but especially in promptness, attendance, and commitment to the success of the
team. By reviewing the large attendance calendar, which is posted and shows
all scheduled vacations, visible to the entire group, the GL is aware of any sched-
uled absences, and has established a plan for those on the previous day. Team
members are required to call in any unscheduled absences 30 minutes before
the shift. The GL then evaluates the staffing and determines what adjustments


228 THETOYOTAWAYFIELDBOOK

Time Team Members Team Leaders Group Leaders

Shift Start
to
Break Time


  • Perform regular
    job duties

  • Follow
    standardized
    work

  • Collect data
    regarding
    production as
    required

  • Perform
    changeovers
    as instructed

  • Activate andon
    when problems
    occur

    • Respond to andon
      calls from TMs

    • Respond to any
      equipment
      stoppages

    • Report any
      problems to GL

    • Review production
      results every hour

    • Record results on
      tracking board

    • Perform quality
      audits every hour

    • Review scrap and
      rework
      containment area

    • Review production
      and material
      kanban status

    • Schedule any
      equipment
      changeovers

    • Respond to
      problems reported
      by customer
      process

    • Record any issues
      in TL shift-to-shift
      logbook

      • Respond to andon calls
        from TMs

      • Respond to any equipment
        stoppages

      • Report any major problems
        to assistant manager

      • Review production results
        every hour

      • Review scrap and rework
        containment area

      • Respond to problems
        reported by customer
        process

      • Walk through work area
        to review status of:
        TM safety compliance
        and unsafe conditions
        Quality of product
        Material/Process flow—
        Ensure that standardized
        work is being followed.
        Pay particular attention
        to shortages or excesses
        of production (these are
        indications of problems).
        Material inventory levels
        5S condition
        Hazardous waste
        storage and disposal






Table 10-1. (Continued)