662
Table 29.1.Overview of the Brewing Processing Steps: From Barley to BeerProcessActionObjectivesTimeTemperature (°C)MaltingSteepingMoistening andPreparation for the germination48 hours12–22aeration of barleyprocessGerminationBarley germinationEnzyme production, chemical3–5 days22structure modificationKilningKilning of the green maltEnding of germination and modification,24–48 hours22–110production of flavoring and coloring substancesMillingGrain crushing withoutEnzyme release and increase of1–2 hours22disintegrating the huskssurface areaMashingwortAddition ofStimulation of enzyme action, extraction1–2 hours30–72separationwarm/hot waterand dissolution of compounds, wort filtration, to obtain the desired fermentable extract as quick as possibleWort boilingBoiling of wortExtraction and isomerization of hop0.5–1.5 hours98and hopscomponents, hot break formation, wort sterilization, enzyme inactivation, formation of reducing, aromatic andcoloring compounds, removal of undesired volatile aroma compounds, wort acidification, evaporation of waterWortSedimentation orRemoval of spent hops, clarification1 hour100–80clarificationcentrifugation(whirlpool, centrifuge, settling tank)Wort coolingUse of heat exchanger,Preparing the wort for yeast1 hour12–18and aerationinjection of air bubblesgrowthFermentationAdding yeast, controllingProduction of green beer, to obtain yeast2–7 days12–22 (ale)the specific gravity,for subsequent fermentations, carbon4–15 (lager)removal of yeastdioxide recovery