Australian Handyman - July 2018

(Grace) #1
EXCAVATED
SITE

SHOVEL

O^2 Mark the court
Use line marking spray paint to
rough out the dimensions of the
court. I used the fence line as
my parallel guide to mark and
spray out a court 2.3m wide and
9.4m long for a inished court
of 2m wide and a bit under
9m long. I spaced the court
1.2m inside the property so I
had room for plants and seating.

O^4 Build and compact the base
Shovel the road base into a wheelbarrow and start dropping
it of on the far side of the court, spreading it and moving
your way down as you go. You want a total of 100mm of
compacted base, which is about 3 cubic metres. Use a
levelling rake to roughly level out the gravel as you work
your way down. ▶

O^3 Excavate the site
Secure a stringline on both sides to give you a reliable
reference for digging, then use a lat-edge shovel to dig
down 200mm. I marked the course extra wide and long
so that I could it the timber and gravel backill.

IMPORTANCE OF COMPACTING
Compacting is an
important step because
your court can settle
over time and create
an uneven surface,
which would be bad
for accuracy and
direction when playing.
You can compact with
a hand tamper, but it
would take forever.
For best results, rent
a small plate compactor
from a local hardware
store or rental centre.
This machine is not as

scary as it looks


  • it starts and drives
    just like a lawnmower
    with a punch, and will
    make all the diference
    to the finished surface.
    Before you compact
    the base of the court,
    mist down the area with
    a hose to keep the dust
    down and to help the
    compaction process.
    Drive it up and down
    the court area in rows,
    compacting the base
    as you go.


SPRAY
PAINT

ROAD BASE

Handyman.net.au JULY 2018 111

OUTDOOR


DIY TIP


If the ground is
very dry, mist
it with a hose
first for better
adhesion of the
spray paint.

Free download pdf