Classic_Boat_2016-02

(Ann) #1
RESTORATION PICTURES BY ANNA BARKHAM

John Garrett cuts away a later steel doubler to
expose the original sheer plate

New splines between old repaired planking
(top) and new (lower)

The newly repainted aft bilge area

Starboard forward topside planking
repairs underway; some new, some
repaired, all refastened

Repairs to the diagonal strapping that runs
between the hull planking and the frames

Hatch repairs and overhaul work
included new brass runners

The GRP that was applied during the Brisbane
refit in 1995 was carefully removed using
gelpeelers to expose the hull planking

Fairing the new planking in the
awkward area of the tuck

The hull repairs meant practically the whole
interior had to be removed for access and then
refitted, such as here in the port cabin

Free download pdf