75
Installation
for Céline, Paris
Project: Smiljan Radic
Design team:
Cristian Fuhrhop
Structural engineering: Arf & Yes
Electrical engineering: Arup
Mechanical engineering: Arf & Yes
Site supervision:
Jean–Phipille Sanfourche / OBO
Client: Céline
Area: 900 m^2
Design date: 5.-8.2017
Realisation: 9.-10. 2017
Photo Smiljan Radic
These pages: a watercolour
sketch by the architect, models of
the design, and the final
installation. This column, top: the
drawing of a turtle from the book
Architettura primitiva by Enrico
Guidoni (1975) used as a
conceptual reference for the
project; opposite page, bottom:
the project in plan
Photo Smiljan Radic
Photos Smiljan Radic