Using the following Risk Matrix determine the level of risk associated with each identified hazard
and record that information in the IR (Inherent Risk) column on the JSA/SWMS form.


  1. Develop and recommend hazard
    control strategies
    Use Codes of Practice, Australian Standards,
    industry guidelines and government
    department information for practical advice
    for achieving acceptable standards when
    determining appropriate control measures.


Hazard control process involves identifying the
range of options available for a specific hazard,
or hazardous situation, evaluating the potential
effectiveness of these options and preparing a
JSA to clearly identify the hazard, the related
control measures to be implement and the
person responsible for ensuring this happens.


The hierarchy of hazard control (where
elimination is the most effective control and
personal protective equipment, the least
effective) should be used to help determine
the most effective controls. A combination of
controls can be used.


Hierarchy of hazard management

LIKELIHOOD

CONSEQUENCE

INSIGNIFICANT MINOR MODERATE MAJOR CATASTROPHIC

ALMOST CERTAIN HIGH (3) HIGH (3) EXTREME (4) EXTREME (4) EXTREME (4)

LIKELY MODERATE (2) HIGH (3) HIGH (3) EXTREME (4) EXTREME (4)

POSSIBLE LOW (1) MODERATE (2) HIGH (3) EXTREME (4) EXTREME (4)

UNLIKELY LOW (1) LOW (1) MODERATE (2) HIGH (3) EXTREME (4)

RARE LOW (1) LOW (1) MODERATE (2) HIGH (3) HIGH (3)


  1. Assess the risks after controls are
    in place
    Using the Risk Matrix, determine the level of
    risk associated with each identified hazard
    after the controls have been determined and
    record that information in the RR (Residual
    Risk) column on the JSA/SWMS form.

  2. Document and authorise
    Record the details on the JSA/SWMS sheet
    and submit to site supervisors for authorisation
    prior to carrying out the job.
    8. Store, review and update
    After the JSA/SWMS is complete, it must be
    reviewed to determine:

    • Did the identified controls reduce the risk?

    • Were any hazards missed?

    • Were the controls effective?

    • Can the risk be reduced further?




Modify the JSA/SWMS accordingly. Any
updates or modifications must be approved
and relevant personnel informed.

TYPE OF CONTROL DEFINITION EXAMPLE

ELIMINATION The hazard is removed altogether; task or process may be eliminated • Removal of asbestos

SUBSTITUTION

Replaces the hazard or hazardous
process with one that presents
a lower risk


  • Use non fibrous insulation instead of
    fibreglass insulation,

  • Use lead free paint instead of lead
    based paint,

  • Use steel fencing instead of
    asbestos fencing.


ENGINEERING CONTROLS

Structural change to the working
environment, equipment/ or work
process that forms a protective barrier
between the hazard and the employee


  • Edge protection,

  • Reversing beeper on moving plant

  • Machine guards,

  • Cranes for heavy lifting.


ADMINISTRATIVE CONTROLS

Reduces the exposure to the hazard
through procedural instructions, training
and signs, permits and procedures etc.


  • Policy,

  • Procedure,

  • Safe work practice,

  • Job safety Assessment,


PERSONAL PROTECTIVE
EQUIPMENT

Worn by exposed employees to
provide a last line defence should
other controls prove ineffective, or it is
used in conjunction with other control
measures. The selection offered by
PPE relies on correct selection, fitting,
maintenance, and use


  • Hard hat/safety helmet,

  • Safety glasses/face mask

  • Ear plugs/muffs,

  • Dust mask/Respirator,

  • Gloves

  • Long sleeve shirt



  1. Elimination

  2. Substitution

  3. Engineering

  4. Administrative

  5. Personal Protective Equipment


Most effective

Least effective

JSAs/SWMSs must be easily accessible to
all employees, subcontractors and persons
involved in, or affected by, the task.

For further information or assistance in relation
to your Job Safety Analysis/Safe Work Method
Statement obligations and requirements
contact Master Builders’ safety manager
Mike Fitzgerald on 9476 9800 or email
[email protected].

Extreme = Risk level 4, High = Risk level 3, Moderate = Risk level 2, Low = Risk level 1