Houses Australia — Issue 118 2017

(Grace) #1
Architect
Local Architecture
5A Grey Street
Fremantle WA 6160
+61 420 581 518
[email protected]
localarchitecture.com.au

Practice profile
A small, design-focused
and versatile practice based
in Fremantle.

Project team
Natalie Miller

Builder
Natalie Miller

Consultants
Building surveyor:
MSA Group
Energy consultant:
Housecat Energy Efficiency
Assessments
Bricklayer: Arch
Brickmasonry

Products
Roofing: Fielders S-Rib
corrugated roof sheet; CSR
Bradford Light Duty Anticon
55 insulation
External walls: Midland
Brick Commons and Heritage
Red bricks
Internal walls: Midland Brick
Commons bricks; timber-
framed 13-mm plasterboard
in Dulux Wash and Wear low
sheen paint
Windows: Architectural
Window Systems Icon
hardware and aluminium
framing; Viridian VTough
toughened glass; Breezway
Altair Louvre Windows
Doors: Joey Cavity Units Joey
Boomer custom cavity slider;
Made Measure leather loops
‘Natural’; Lockwood pivot
stainless steel hardware
Flooring: Remill recycled
jarrah floorboards in Osmo
Polyx-Oil satin matt finish

Lighting: Inlite Ecostarr
LED downlights; Santa and
Cole Max Bill pendant from
Mobilia; Nordic Tales Bright
Sprout pendants; Muuto
E27 pendants
Kitchen: a2f Tartana R
kitchen mixer; Franke
undermount sink; Smeg Fab
32 fridge; QStone benchtops
in ‘Supreme White’; Fisher
and Paykel cooktop, oven,
microwave and dishwasher
Bathroom: Caroma Marc
Newson tapware, basins,
toilet suites and showers;
Scout Regalia SR wall hooks;
custom outdoor shower by
the architect in bare brass
and copper; Casalgrande
Padana floor and wall tiles
in ‘Natural White’
Heating and cooling:
Velux electric skylights;
Vertilux roller blinds
External elements: Midland
Brick heavy-duty clay pavers
in ‘Red’; Remill recycled jarrah
decking in Organoil finish
Other: Nomi Time dining
table and Woodstack chairs;
Joquer Time sofas with
Kvadrat upholstery from
Mobilia; Raw Edge Furniture
cabinetry; Concrete Studio
outdoor sink; Steadyrack
bike racks

Area
Site: 250 m^2
Floor: 170 m^2

Time schedule
Design, documentation:
1 year
Construction:
1 year, 6 months