APRIL/MAY 2018 63
building hall, and next to it was the big
cat under construction, then its cabin-
top, and then the hull in mold. When
nished, the cabintop will be raised
(465m^2 ) for o ces, metal shop, parts
department, and employee lunch room.
During my visit, the rowboat occu-
pied space at one end of the main
catamarans, the hull mold, and the 28'
oceangoing rowboat), a 35' x 70' (10.7m
x 21.3m) paint area, two 35' x 70'
mechanical service areas, and 5,000 sq
Left—The rigging shop occupies part of the mezzanine overlooking the building’s main oor. Right—Full-size patterns are printed
on Mylar and then transferred to the material—in this case, Divinycell for parts of the rowboat. CNC cutting was abandoned, as its
programming took too long.
COURTESY SCHOONER CREEK
Learn more at:
®
by Wallace Marine Services, Inc.
843-693-4336
Demo Video
Experience
a dry bilge.
SchoonerCreek172-ADFinal.indd 63 2/22/18 3:47 PM