248 APPENDIX G FIGURE G.4. Ready to Install the Program Screen. FIGURE G.5. InstallSheild Wizard Complete Screen. The user click ...
WinEst Software and Spreadsheets 249 FIGURE G.9.WinEst Database Browser. sparse; however, a good estimator will always be workin ...
250 APPENDIX G LOADING THE SPREADSHEETS Before modifying the spreadsheets, they need to be loaded on a local computer’s hard dri ...
WinEst Software and Spreadsheets 251 FIGURE G.11.Explore CD Window. ...
FIGURE G.12. Subcontractor Bid Tabulation. 252 ...
WinEst Software and Spreadsheets 253 Project: Estimate No. Location Sheet No. Architect CUT & FILL Date Items By Checked Gri ...
254 APPENDIX G FIGURE G.14.Project Estimate Summary Sheet. ...
Project Estimate No. Location Sheet No. Architect Date Items By Checked /s dn uo P rae niL ra B eca pS W L tso C to oF tee F ezi ...
Project Estimate No. Location Sheet No. Architect Date Items By Checked Waste Purch. Prod. Wage Labor Unit Cost Cost Code Descri ...
FIGURE G.17. Worksheet to Calculate Reinforcing Bars in Slabs. 257 ...
258 APPENDIX G FIGURE G.18.Worksheet for Quantifying Structural Steel. ...
WinEst Software and Spreadsheets 259 Building Parameters Building Length 100 ft Number of Bays Long 5 ea Bay Length 20 ft Buildi ...
FIGURE G.20. Generic Estimate Work Up Sheet. 260 ...
401(k), 58 A Abbreviations electrical, 216 HVAC, 222 plumbing, 219 Acceptance, project, 14 Accessories concrete, 108 drywall, 20 ...
Bid (continued) deadline, 6 decision to, 29 documents, 8 form, 18, 23–24 information, 8 lowest, 6, 24 lump-sum, 7 negotiated, 7, ...
fill, 116 finish, 116 finishing, 108–110 floor slab, 81 footings, 112 forms, 111–114 girders, 109 heating of, 110–111 job-mixed, ...
Door (continued) prefinished, 192 productivity rate, 193 revolving, 192 schedule, 192 shop drawings, 192 subcontractor, 192 swin ...
Field engineer, 51 measurements, 12 reports, 64 staff, 45 supervision, 64 Fill, excavation, 67–74, 76–77, 87 Final payment, 14 F ...
Housing, 31 Hundredweight, 100 HVAC, 32, 221–223, 227 abbreviations, 222 checklist, 222–223 subcontractor, 215, 221 symbols, 222 ...
coping, 132 fire rating, 119 flashing, 122, 126, 130 glazed, 122, 125, 133 labor hours, 124, 133 lintels, 126, 132 reinforcing, ...
«