Dalmia DSP Success Story

(Project Pridr) #1

TECHNICAL PREPARATION 9


Pre-heater Cyclones


For pre-heater cyclone sizing and design, the specific
requirement given to all suppliers were:



  1. 350 mmwg pressure at fan inlet on guaranteed
    output: To reduce the PH fan specific power
    consumption as low as possible, 350 mmwg was
    the minimum PH fan inlet guaranteed draft as yet.
    There was a lot of reluctance on this parameter as,
    due to this, suppliers had to increase their cyclone
    size and they had doubts on material dropping due
    to lower velocity profile in PH cyclones and risers.
    We discussed and convinced all suppliers along with
    their principals that, normally plants were operated
    with lower pressure drop and velocity during start
    up, and no material drop was observed. Finally,
    they agreed and offered the required parameter and
    sizing accordingly.

  2. Pre-heater cyclone efficiencies: To get the benefit
    of reduction in dust loss and reduction in PH exit
    temperature due to better heat transfer.
    We have given the requirement of 95% cyclone
    efficiency for all cyclones however KHD and LNVT
    have offered increment in their cyclone efficiencies
    whereas FLSmidth and TKIL have offered us their
    standard efficiency cyclones but also assured that
    their principals are working on it and in the R&D
    stage.