Dalmia DSP Success Story

(Project Pridr) #1
CONTRACT AwARDs 47

With a vision to install the best plant, the final
specifications of major equipment awarded on M/s
FLSmidth as mentioned below:


Section Operating Remarks
Raw mill
(HRP 3.07)

600 TPH – guaranteed Grindability – 5 kWh/t
@ 15% R on 90 μ
666 TPH – operating Grindability – 4.5
kWh/t @ 15% R on
90 μ
706 TPH – operating Grindability – 4.5
kWh/t @ 18% R on
90 μ
Blending silo 12,000 m^3 15,000 T
Coal mill
(ATOX 32.5)

37 TPH 38 HGI @ 1% R on 90 μ
41 TPH (expected) 38 HGI @ 3% R on 90 μ

Kiln size 5 x 81 mtr (4.5% slope) VL 5.94 @ 8,000 TPD
guaranteed capacity
VL 7.06 @ 9500 TPD
potential capacity
Pre-heater 6-stage – 2-string (total
volume: 11,378 m^3 )
[2 x 7,500 (CCX), 2 x
9,000 (2–6 stage)]

PH fan pressure 350 at
guaranteed capacity and
501 mmwg @ potential
capacity
Pre-calciner 8.5 m x 66.2 m (main
vessel)
8.15 m x 62 m (goose
neck + exit duct).
Effective volume: 6,884 m³

Total retention time –
14 sec @ operating
capacity

Downcomer
duct

6-metre dia. From CCX
cyclone cone up to PH
boiler bifurcation duct,
then 4.75 m dia. In
direct line up to PH fan

Pressure drop in DC
duct is 30 mmwg and
velocity 16 m/sec
(WHRS off mode) @
8,000 TPD