144 ENVIRONMENTALENGINEERINGF@m 7-9. Head loss in a Mter a~ measured by a mauometQ Note
loss in a clean 6lta audiY~ is head loss in a dirty Mkr.
headwhede
L = depth of Mer,
f =frictionfactor.
D = “pipe” diameter,
v = velocity in “pip,” andHowever, the “pip” or channels through the sand arc not straight and D varies,
SO we can substitute D = 4R, whaefuea 7&/4 D
wettd-perimttea nD 4R= - - -hydraulicJatio.
We thua have
L v2
hL= f --.
4R 2gThe velocity of &e water approaching the sand isQ
A’ ’va = -
and the velocity through the bed is
VP
ev=-,wheree = pomaity, or fraction of open spama in the sand,
Q =flowrate,&
A’ = surface -of thc sand bed.Thc total channel volume is the porosity of the bed multiplied by the total volume,
or cV. The total solids volumc is (1 - e) times the total volume, which is also equal